Click on the link or image below to view your selected video or photo gallery.
| Date: | Photo Gallery or Video | Chronologically: |
| 01-14-10 | ![]() |
360 video of the Sanctuary Pews being installed Photo Gallery of the progress in the Sanctuary this week. |
| 12-31-09 | ![]() |
Photo Gallery of Sanctuary and Middle School areas nearing completion |
| 12-01-09 | Video (360-degree) |
|
| 11-12-09 | ![]() |
Photo of the Day: Sanctuary renovation continues... |
| 10-21-09 | ![]() |
Middle School Renovation and more... |
| 10-14-09 | ![]() |
Sanctuary renovation continues... Click to view larger still photo. |
| 10-01-09 | ![]() |
The Fellowship Hall is readied for worship (which begins Sunday, October 4)... |
| 10-01-09 | ![]() |
Sanctuary Renovation began this week... |
| 08-22-09 | Children's Building Grand Opening Photo Gallery (112 photos). | |
| 08-22-09 | ![]() |
Children's Building Grand Opening Day has finally come! The ribbon-cutting video is available now; please check back for a photo gallery of all the events of the day |
| 08-16-09 | Dozens of volunteers assisted with moving Day(s) into our new Children's Building... Video Photo Gallery |
|
| 07-31-09 | ![]() |
Sidewalks connecting the new Children's Building to the Office were poured today and should be available for use on Sunday, August 2. |
07-17-09 |
![]() |
Extensive "site work" including our new curbing and drive-thrus has been occurring this week, connecting our entire campus. Check it out here. |
| 07-08-09 | Designers have arrived to suddenly give life and color to the interior of our new Children's Building. Enjoy just this sneak preview of the special environment currently underway... | |
| 04-29-09 | View today's photo gallery of bricklaying, window caulking and woodcovering being installed... | |
| 04-29-09 | ![]() |
Video of bricks being hoisted to the scaffolding for bricklayers on the south wall, while covering is prepared in the background... |
| 04-26-09 | ![]() |
Rev. Rurel Ausley gives a tour of the progress of the new Children's Building (after his nap...) |
| 04-17-09 | Trusses are hoisted into place and workers are busy on the trusses and various parts of the building... View videos at left Click here to see larger (still) images: |
|
| 04-07 and 04-08-09 | ![]() ![]() |
Our "white sandy beaches"... and upper level insulation videos.
(Two videos on one page) |
| 04-08-09 | ![]() |
Photo of the Day: The magnificent glass entry area of the new Children's building where the slide and stairs between the floors are located. |
| 04-07-09 | ![]() |
Photo of the Day: The beautiful brick of the rounded exterior of the new Children's Building. |
| 03-20-09 | ![]() |
Photo of the Day: Walkway between Sanctuary Gathering Area toward the connecting hub/hinge by the Children's Building and straight across the street into the Community Life Center. |
| 03-06-09 | ![]() |
Brick on the exterior of the Children's Building continues to rise! View larger image of photo at left. |
| 02-19-09 |
|
A hard hat was donned to go on a tour through the first and second floors of the Children's Building! (View Four videos) including...
Video: First Floor interior hallway to nursery and classrooms for preschoolers
Second Floor interior - span
|
| 02-13-09 | ![]() |
Welding along the top of the Children's Building perimeter
|
| 01-30-09 | The interior walls are beginning to go up, and the exterior is being prepared for external brick. |
|
| 01-07-09 | ![]() |
It seems every day major changes occur to our new Children's Building. On January 7, 2009, the 2nd floor concrete was poured and smoothed for the area that will become "Crosswalk"! |
| 12-30-08 | View this Photo Gallery of the current progress of the expanse of the Children's Building as of December 30, 2008. | |
| 12-30-08 | ![]() |
Check out this incredible video of how easily the "boom" can move items to the second story of the building. View is from across Helms in front of the Community Life Center. |
| 12-16-08 | ![]() |
More beams connecting everywhere. View from the front of the Children's Building, taken from Partin Drive on December 16. |
| 12-05-08 | ![]() |
Click on the thumbnail at left to view a photo of the front of the Children's Building, taken from Partin Drive. |
| 11-13-08 | ![]() |
Steel beams were delivered today to the construction site, with the unloading assistance of more "unusual-looking" equipment! The building should really start gaining height and structure soon. Check back regularly for more progress. |
| 11-12-08 | ![]() |
Amazing daily progress is visible as the walls are layered higher and higher by masonry workers, with window areas enclosed in some areas. The "rounded" part of the building is more visible, and the stairs are now concrete. |
| 11-06-08 | ![]() |
This video shows our site is beginning to take the shape of our Children's Building with some walls and window areas, ramp and stairs, as well as more concrete flooring poured in the "rounded" area of the new building toward the intersection. |
| 10-28-08 | ![]() |
On Tuesday, October 28, our site was busy with quite a number of workers smoothing the recently poured concrete floor of the Children's Building. |
| 10-22-08 | ![]() |
Plumbing and concrete floors are now evident in the construction progress on the Children's Building. This Video is panning from side to side of the building site. |
| 10-14-08 | ![]() |
|
| 10-13-08 | ![]() |
|
| 10-02-08 | Check out the continued progress as new layers of block continues to be laid, and carefully examined. | |
| 09-25-08 | ![]() |
Video of the week -- panning left to right on the site, which shows the perimeter of the building and walls getting higher. |
| 09-23-08 | ![]() |
On Tuesday, September 23, the walls of the Children's Building are getting higher and the building is taking shape around its perimeter! View larger photo of image at left.
|
| 09-16-08 | ![]() |
On Tuesday, September 16, our site was busy with quite a number of workers beginning to lay block on some of the footings, while another team of workers was busy preparing a trench and piping for electrical conduits. |
| 09-10-08 | ![]() |
In the early morning of September 10, cement began to flow into the footings of the Children's Building, with some hard-hat supervision and inspection. |
| 09-10-08 | ![]() |
Photo of the day... smoothing fresh cement in the footings. |
| 08-21-08 | ![]() |
A bird's-eye view video of the continued progress in preparation for footings for the Children's Building. |
| 08-15-08 | Bringing water across Partin Drive Photo Gallery On Friday, August 15, water pipes were brought "under" Partin Drive So. from the east side to the west side for the new Children's Building, using a "directional rig". |
|
| 08-12-08 | ![]() |
Video of the Day With "central command" of building plans on sawhorses in the middle of the site, workers continue to dig and displace dirt accordingly in preparation for the footings. |
| 08-12-08 | ![]() |
"Photo of the Day"... Reading plans in "central command" in the middle of the construction site. |
| 08-08-08 | ![]() |
"Photo of the Day"... More surveying and positioning markers for the building. (Taken from church office doorway) |
| 07-30-08 | ![]() |
"Groundwork" Video |
| 07-24-08 | ![]() |
Cook Family with "Cross-Tree" Photo Gallery |
| 07-24-08 | Clearing the Construction Area Photo Gallery | |
| 07-10-08 | Groundbreaking for our Children's Building Photo Gallery |